Cooperation
Business model
1.
From the green by the company responsible for the whole project construction investment, a longer period (15 years) of the franchise contract, the final disposal of sludge drying project operation and after dehydration.
2.
From the green by the company responsible for the whole project construction investment, a longer period (15 years) of the franchise contract, responsible for project operation.
3.
The sales system equipment (the main equipment, auxiliary equipment) to the owners, or sales of main equipment, auxiliary equipment design and configuration requirements for procurement by the owners themselves processing; and from the green by the responsible project operation (operation period of 10 years or more).
4.
The sales system equipment (the main equipment, auxiliary equipment) to the owners, or sales of main equipment, auxiliary equipment design and configuration requirements for procurement by the owners themselves processing.